Products

This is where you can browse products in this store.

Request a technical proposal See engineering capability

Showing 33–36 of 36 results

  • Semi-Automatic Assembly Workstation

    Semi-Automatic Assembly Workstation

    • Applicable Scenarios: High-mix, low-volume assembly processes, or processes where the return on investment (ROI) for full automation is low.

    • Core Configuration: Positioning fixtures, auxiliary assembly mechanisms, tightening/press-fitting components, and inspection units.

    • Solution Highlights: Balances flexibility and efficiency with low investment and quick returns; reduces manual operation difficulty and improves assembly consistency; can be gradually upgraded for a smooth transition to full automation; suitable for production scenarios with rapid product iterations and medium-volume batches.

  • Sunroof Electronic Test Fixture, HUD Testing Station

    Sunroof Electronic Test Fixture, HUD Testing Station

    • Applicable Products: Automotive sunroof electronic components, HUD (Head-Up Display) modules.

    • Core Functions:

      • Sunroof Electronic Test Fixture: Functional testing, endurance (life cycle) testing, and current detection to verify the reliability of the sunroof electronic control system.

      • HUD Testing Station: Utilizes machine vision inspection technology to test parameters such as display effects, clarity, distortion, and brightness, accurately identifying defects.

    • Solution Highlights: Vision inspection replaces subjective manual judgment, ensuring unified testing standards and traceable results; test parameters are customizable to match the product standards of different vehicle models; supports both offline sampling and in-line 100% inspection modes.

  • Valve Module Assembly Line

    Valve Module Assembly Line

    The Valve Module Assembly Line is a high-precision automated assembly line developed by Guangke Industry specifically for NEV thermal management integration modules. It is primarily designed for the automated assembly, inspection, and EOL (End-of-Line) testing of various valve modules, including EXV (Electronic Expansion Valves), SOV (Shut-Off Valves), and CV (Control Valves). Adapting to the production requirements of valve components for NEV thermal management and energy storage thermal management systems, it fully meets the control requirements for product special characteristics and CC/SC (Critical Characteristics / Significant Characteristics).

  • Water Integration Module Assembly Line

    Water Integration Module Assembly Line

    The Water Integration Module Assembly Line is a dedicated automated production line developed by Guangke Industry in response to the integration trend of thermal management systems. It is designed to meet the assembly, inspection, and final testing (EOL) requirements for water integration modules used in new energy vehicles (NEVs) and energy storage systems. The line integrates the unified assembly and testing of multiple components, including valve blocks, pipelines, sensors, and heat exchangers.