NEV PTC Heater Assembly & Test Line

Applicable Products
Assembly and performance testing of high-voltage PTC heaters, water-heating PTCs, and air-heating PTCs for new energy vehicles
Core process flow
PTC heating core feeding → housing encapsulation and assembly → high-voltage wiring component assembly → sealing and glue filling → curing → insulation and voltage withstand test → power performance test → air tightness test → finished product off-line

Description

This production line is a customized circular modular automatic assembly and testing integrated production line for on-board heating PTC heaters for new energy passenger vehicles and commercial vehicles, suitable for flexible mass production of high-pressure water-cooled/air-type PTC products.

Covering the entire process integration of automatic feeding, structural assembly, wire harness insertion, intelligent tightening, visual appearance inspection, high-voltage power-on aging, insulation safety regulation, CAN bus electronic control performance, and air tightness, equipped with RFID single-piece full-process traceability, Siemens PLC control system, real-time production dashboard, and capable of interfacing with MES system, it is specifically designed for the thermal management heating unit of new energy vehicles, providing a complete set of non-standard automation solutions and compatible with rapid production changeover for multiple vehicle models on the same production line.

Key Advantages & Highlights

Flexible Modular Workstation Design Independent workstation splitting, on-demand addition/removal of assembly/inspection units, model changeover completed in 2 hours;
Multi-dimensional High Voltage Safety Inspection Integrates insulation withstand voltage, leakage current, temperature rise endurance, and CAN communication logic testing, covering stringent OEM entry standards;
Ring Rotation Lean Layout Circular circulation of product pallets, reducing material handling distance, enhancing takt time stability;
Full-Link Digital Traceability RFID pallet + barcode dual traceability, permanent archiving of assembly parameters and inspection data for each PTC unit;
High Equipment Comprehensive Utilization OEE stable ≥90%, Profinet 100Mbps high-speed communication, zero-latency multi-device synchronous coordination;
Man-Machine Safety Protection Fully enclosed safety fencing, photoelectric safety light curtains, emergency stop interlock, automatic shutdown and alarm on fault;

 

Core System Specifications Table

Parameter Item Technical Specification
Applicable Product NEV water-cooled PTC, air-heating PTC; Voltage: 300V-800V
Standard Production Cycle Time 180s / piece; customizable and optimized based on customer capacity
Control System Siemens S7-1500 PLC + Industrial Touch HMI
Communication Protocols PROFINET, CAN 2.0, LIN Bus, TCP/IP
Traceability Method RFID pallet traceability + 1D/2D barcode scanning and data collection
Measurement Accuracy Dielectric Withstanding Voltage ±0.5% FS, Temperature Rise ±0.1°C, Torque ±3%
Line Footprint Standard model: 45m × 4.2m; scalable upon request
Drive Units Servo tightening modules, 6-axis collaborative robots (cobots), loop conveyor system
Environmental Adaptability Workshop temperature: 0~40°C; Humidity: 30%~80% (non-condensing)
Data Storage Local Industrial PC (IPC) storage + Cloud MES integration; data retention ≥ 10 years

 

Core Functions and Value in Detail

Automated Loading & Assembly Function  

Robotic automatic picking of PTC housings, heating cores, sealing gaskets, and high-voltage wiring harnesses; servo-controlled precision press-fitting; multi-axis intelligent torque tightening. Automatically distinguishing torque thresholds for different bolt specifications to eliminate missed, loose, and over-tightening. High-definition (HD) industrial camera vision inspection identifies cosmetic defects such as housing scratches, gasket misalignment, harness damage, and terminal skewing. Defective products are automatically diverted and isolated to intercept cosmetic defects early and prevent outflow.

 

Vision-based Cosmetic Defect Inspection Function  

HD industrial camera vision inspection identifies cosmetic defects such as housing scratches, gasket misalignment, harness damage, and terminal skewing. Defective products are automatically diverted and isolated to intercept cosmetic defects early and prevent outflow.

 

High-Voltage Power-On Aging & Electronic Control Test  

Simulates vehicle VCU (Vehicle Control Unit) signals and issues control commands via CAN bus. Conducts a continuous 40-minute temperature rise aging test, with real-time monitoring of heating power, current, and temperature control protection logic to verify PTC operational stability under high and low-temperature conditions. Simultaneously completes safety compliance tests (dielectric withstand voltage, insulation, and leakage current) to eliminate high-voltage safety hazards.

 

Airtightness Leak Detection Function  

Utilizes dry vacuum leak detection to test for leaks in the housing’s sealed pipelines. Micro-leak detection accuracy is ≤1×10⁻⁴ mbar·L/s. No water immersion test is required, thus avoiding internal moisture corrosion of the product.

 

Digital Production Management & Control Function  

Real-time dashboards display production capacity, yield rate, and equipment faults. MES integration enables work order dispatching, material batch binding (traceability), root cause analysis of defects, and equipment OEE (Overall Equipment Effectiveness) statistics. Supports remote monitoring of line operational data for management.

Business Value: Manufacturing cost per unit is reduced by 35%; factory defect rate (outgoing quality) is reduced to below 0.3%; production capacity is increased by 2 times. It meets the OEMs’ annual batch delivery demand of over 100,000 units, and the entire line’s equipment investment can be recovered (ROI) within 3 years.

 

 

Supporting Services & Delivery Assurance

  1. Pre-project Solution Services: Free on-site survey, capacity estimation, joint process R&D, and 3D production line layout design output;

  2. Lead Time: 60 working days for production integration of standard lines, and 90 working days for large customized lines;

  3. On-site Implementation & Delivery: Factory pre-commissioning → Disassembly and logistics shipping → On-site installation and wiring → Full-line joint commissioning → 72-hour full-load trial production;

  4. Training Services: Comprehensive training on on-site operation, equipment maintenance, basic PLC programming, and MES system operation; providing both paper and electronic operation manuals;

  5. After-sales Support: 1-year free warranty for the entire machine, and a 2-year warranty for core components (PLC, servo systems, robots); 4-hour response time in writing; on-site engineer dispatch within 12 hours in the Yangtze River Delta and 24 hours nationwide; lifetime spare parts supply at cost and annual production line upgrade & optimization services.

Reviews

There are no reviews yet.

Be the first to review “NEV PTC Heater Assembly & Test Line”

Your email address will not be published. Required fields are marked *