Multi-Way Valve Assembly Line

Applicable Products
Multi-way valves, integrated valve blocks, water circuit distribution valves, and integrated thermal management valve bodies for NEV thermal management.

Core Process Flow
Valve Body Loading and Positioning → Spool and Seal Pre-assembly → Valve Cover Assembly and Intelligent Tightening → Independent Airtightness Testing for Each Flow Channel → Flow Path Switching Performance Testing → Laser Marking → Finished Product Offloading (EOL)

Description

This fully automatic assembly and inspection line is designed for core multi-way directional valves used in NEV (New Energy Vehicle) on-board batteries and energy storage liquid-cooled systems. It covers the entire production process, including spool press-fitting, seal ring assembly, solenoid coil fastening, wire harness welding, high-voltage insulation testing, water circuit dry leak testing, and EOL (End-of-Line) full performance testing. The line integrates robotic automated loading, vision-based defect recognition, intelligent torque tightening, and full RFID pallet traceability. Featuring scalable modular workstations, it is compatible with flexible mixed-model production for various valve body specifications (ranging from 2-way to 8-way). It is ideally suited for the large-scale manufacturing of thermal management valve components for NEV passenger vehicles and energy storage stations.

Key Advantages & Highlights

Dedicated High-Voltage Testing System for NEVs

Integrates comprehensive high-voltage safety testing, including dielectric withstand voltage, insulation, temperature rise, and CAN bus communication.

Flexible Modular Expansion

Customers can initially purchase basic assembly workstations and later add EOL testing and robotic units.

Stable OEE ≥ 90%

High-speed PROFINET communication, multi-device synchronization, and a low equipment downtime rate.

Optional High-Precision Helium Leak Detection

Meets the stringent micro-leak detection standards required for the export of energy storage equipment.

Loop Pallet Circulation

Automatic return of empty pallets, reducing manual material handling labor by 70%.

Complete MES Data Interoperability

Seamless integration of work orders, materials, and inspection data with the factory’s digital management system.

 

Core System Specifications Table

Applicable Products

NEV on-board / energy storage 2- to 8-way thermal management directional valves

Standard Cycle Time

180s / unit

Control System

Siemens S7-1500 PLC, 15-inch Industrial Touch HMI

Communication Protocols

PROFINET, CAN FD, LIN bus

High-Voltage Test Range

DC 300~800V, Dielectric Withstand Voltage 2kV

Leak Detection Accuracy (Standard Dry Type)

1×10⁻⁴ mbar·L/s; Optional helium leak testing 1×10⁻⁶ mbar·L/s

Tightening Torque Accuracy

±2% FS, Torque Range 0.5~25 N·m

Traceability Carrier

High-temperature resistant metal RFID pallet

Line Footprint

48m × 4m, available for phased split delivery

 

Core Functions and Value in Detail

Robotic Fully Automatic Precision Assembly

Six-axis collaborative robots pick and place valve housings, spools, seal rings, and solenoid coils. Servo press mechanisms perform press-fitting, and multi-axis synchronous tightening secures bolts. Real-time acquisition of press-fitting force and torque curves. Automatic alarms and segregation of defective products for press-fitting deviations or missed tightening, replacing 8 assembly workers.

AI Vision-Based Defect Detection

HD industrial cameras detect missing seal rings, skewed coil assembly, housing dents, and wire harness damage. AI algorithms automatically classify defects, and images are synchronously archived for process review, intercepting cosmetic and assembly defects early to prevent outflow.

High-Voltage Electronic Control & Switching Performance Testing

Simulates vehicle BMS / energy storage PCS control signals and issues multi-way switching commands via CAN FD. Collects valve switching response speed, coil operating current, and temperature rise curves, completing a 40-minute high-voltage aging test to verify valve operational stability under high and low-temperature conditions. Synchronously completes dielectric withstand voltage and leakage current safety compliance tests to eliminate high-voltage leakage safety hazards for NEVs.

Dual-Stage Water Circuit Sealing Leak Detection

Standard dry vacuum gross leak testing rapidly screens out large-leak defects. Optional helium tracer vacuum fine leak testing precisely locates micron-level micro-leaks, complying with export testing standards for overseas energy storage equipment, fundamentally eliminating the risks of slow coolant leakage in liquid-cooling systems and battery thermal runaway.

Full-Process Digital Production Management & Control

Real-time production dashboards display capacity, yield rate, and equipment OEE (Overall Equipment Effectiveness). MES integration enables work order dispatching, material batch binding, and full-life-cycle data traceability of individual parts. Supports management with remote monitoring of line operations and the output of multi-dimensional production data analysis reports.

Business Value: The factory defect rate of multi-way valves related to switching failure and coolant leakage is reduced by 93%. A single production line can achieve an annual output of 120,000 valve bodies. Energy storage customers can meet the EU sealing access standards for energy storage equipment, with equipment investment fully recovered (ROI) within 2.5 years.

 

Supporting Services & Delivery Assurance

1.Pre-project Solution Services: Free process testing for valve body samples, capacity estimation, phased expansion planning, and 3D production line layout drawings;
2.Lead Time: 65 working days for a standard basic assembly line, and 90 working days for a complete line equipped with helium leak testing and EOL (End-of-Line) testing;
3.Implementation & Delivery: In-house full-load trial production with valve bodies → Disassembly and logistics shipping → On-site joint commissioning of robots, high-voltage testing, and vacuum piping → 72-hour continuous full-load acceptance test;
4.Training Services: Comprehensive training on robot teaching, high-voltage testing parameter calibration, CAN bus program editing, and MES operation & maintenance, accompanied by both paper and electronic operation and maintenance manuals;
5.After-sales Support: 1-year free warranty for the entire machine, and a 2-year warranty for PLCs, servo systems, robots, and high-voltage testing modules; 4-hour written response to customer inquiries; on-site engineer dispatch within 12 hours in the Yangtze River Delta and 24 hours nationwide; lifetime spare parts supply at cost and annual free upgrade and optimization of production line functions.

Reviews

There are no reviews yet.

Be the first to review “Multi-Way Valve Assembly Line”

Your email address will not be published. Required fields are marked *