Valve Module Assembly Line
The Valve Module Assembly Line is a high-precision automated assembly line developed by Guangke Industry specifically for NEV thermal management integration modules. It is primarily designed for the automated assembly, inspection, and EOL (End-of-Line) testing of various valve modules, including EXV (Electronic Expansion Valves), SOV (Shut-Off Valves), and CV (Control Valves). Adapting to the production requirements of valve components for NEV thermal management and energy storage thermal management systems, it fully meets the control requirements for product special characteristics and CC/SC (Critical Characteristics / Significant Characteristics).
Description
The Valve Module Assembly Line is a high-precision automated assembly line developed by Guangke Industry specifically for NEV thermal management integration modules. It is primarily designed for the automated assembly, inspection, and EOL (End-of-Line) testing of various valve modules, including EXV (Electronic Expansion Valves), SOV (Shut-Off Valves), and CV (Control Valves). Adapting to the production requirements of valve components for NEV thermal management and energy storage thermal management systems, it fully meets the control requirements for product special characteristics and CC/SC (Critical/Significant Characteristics).
Featuring a modular design concept, the line ensures stable and efficient operation. It achieves an overall cycle time of up to 95s and maintains an OEE (Overall Equipment Effectiveness) consistently above 90%. With integrated full-process data traceability capabilities, it effectively enhances production efficiency, ensures product consistency, and reduces labor costs. Customized solutions are available based on the customer’s capacity and floor space requirements.

Key Advantages & Highlights
|
Modular Flexible Design |
Standardized modular unit combinations support mixed-model production of multi-type valve products, enabling rapid changeover and adapting to product iterations. |
|
Efficient Production Cycle Time |
The overall cycle time can reach up to 95s. Stable capacity meets the requirements for high-volume and large-scale production. |
|
Stable and Reliable Operation |
Line OEE (Overall Equipment Effectiveness) is consistently ≥ 90%. Core components utilize premium brand configurations, resulting in a low failure rate and strong continuous production capability. |
|
Full-Process Traceability |
Integrated RFID traceability system with full-process recording of assembly and inspection data, enabling precise localization of quality issues. |
Core System Specifications Table
| Basic Performance | Applicable Products | EXV / SOV / CV and other thermal management valve modules, multi-way valve assemblies |
| Overall Cycle Time | ≤95S | |
| Overall Equipment Effectiveness (OEE) | ≥90% | |
| Layout Configuration | Linear / Loop type (Optional) | |
| Core Configuration | Control System | Siemens S7-1500 series PLC |
| Communication Method | PROFINET bus communication | |
| Traceability Method | Full-process RFID traceability | |
| Tightening System | Intelligent torque-controlled tightening, automatic data upload | |
| Testing Capabilities | Inspection Items | Assembly dimensional inspection, electrical performance testing, water-side dry leak testing, airtightness testing |
| Control Method | CAN/LIN bus compatibility | |
| Customization Support | Solution Customization | Supports on-demand customization of capacity, layout, and processes |
| System Integration | Supports integration with customer MES (Manufacturing Execution System) |
Core Functions and Value in Detail
|
Automated Loading Technology |
Robotic automated loading replaces manual loading and unloading, reducing manual intervention, improving loading accuracy and efficiency, and minimizing human errors. |
|
Robotic Precision Assembly |
Core assembly processes utilize industrial robots, ensuring stable assembly accuracy and high consistency, adapting to high-volume continuous production requirements. |
|
Screw Tightening Technology |
Intelligent torque-controlled and angle-controlled tightening. Tightening data is automatically recorded and uploaded to ensure assembly force meets standards and satisfy quality traceability requirements. |
|
Vision Recognition Technology |
Vision inspection is configured at critical processes to accurately identify assembly defects, missing or misassembled parts, and reject non-conforming products in real-time to guarantee factory yield. |
| Water-Side Channel Dry Leak Testing | High-precision airtightness testing accurately identifies potential micro-leaks, ensuring the sealing performance of valve modules and meeting the stringent sealing requirements of thermal management products. |
| Electrical Performance Testing Technology | Supports electrical performance testing controlled via CAN/LIN bus, comprehensively verifying product functions to ensure stable and reliable factory performance. |
| Application Scenarios & Applicable Products | • Application Fields: NEV thermal management, energy storage thermal management, commercial HVAC systems. • Applicable Products: NEV integration module valve components, EXV (Electronic Expansion Valves), SOV (Shut-Off Valves), CV (Control Valves), thermal management multi-way valve modules, water integration module valve blocks. • Expandability: Supports customized adaptation to the assembly requirements of other thermal management valve products based on customer product characteristics. |
Supporting Services & Delivery Assurance
Guangke Industry provides end-to-end services from solution design to after-sales operation and maintenance (O&M), ensuring the stable implementation and long-term operation of the production line:
-
Customized Solutions: Provide exclusive process layout plans on demand, tailored to the customer’s capacity, floor space, and product requirements;
-
Manufacturing: Produced in our in-house factory with full-process quality control, strictly executed in accordance with the ISO9001 system;
-
Installation & Commissioning: A team of professional engineers performs on-site installation and commissioning to ensure the production line is delivered and meets all standards;
-
Technical Training: Provide full-process training on operation and maintenance to empower the customer’s team for independent O&M;
-
After-sales Support: 6 major service networks nationwide, 4-hour written response, on-site handling within 12 hours in the Yangtze River Delta and 24 hours nationwide, and 24/7 technical support.





Reviews
There are no reviews yet.