Engineering and manufacturing capability
Design, machining, software and commissioning in one organisation — about 100 people across four sites, with factory acceptance carried out on our own floor before anything ships.
01 — Organisation
Design starts on the shop floor, not in the sales office.
The company began in 2014 as an automotive tooling and gauge maker. That origin is still visible in how a project runs: the fixture and the measurement method are agreed before the station layout is drawn, and the people who design it are the people who debug it.
Mechanical design, electrical design, software, machining, assembly and commissioning sit in the same organisation. Nothing critical is subcontracted to a party that has never seen the part.

02 — Team
Roughly 100 people, and most of them are engineers.
Headcount split across the group. A non-standard line is engineering hours more than it is machine hours, which is why the design and field-service teams are the largest blocks.
Mechanical design
Station layout, fixture and gripper design, 3D line simulation, tolerance stack-up.
Electrical design
Schematic and cabinet design, safety circuit, sensor and drive selection, E-plan output.
Software
PLC and HMI programming, recipe management, MES interface, test-data archiving.
Project & field service
Project management, installation, commissioning, training and after-sales response.
Machining base
Machinists and 20+ machine tools: milling, grinding, wire EDM, CNC machining centre.
Sales & support
Four sales engineers and 21 supporting staff across six sales regions.
Figures as of 2026. Headcount is reported as 80+ in earlier company material and 100+ in the 2026 brochure — the current figure should be confirmed before publication.
03 — Footprint
Four sites, so build and commissioning do not queue behind each other.
Shanghai carries engineering, machining and factory acceptance testing. The Jiangsu and Hubei plants carry line manufacturing and regional service, which is what makes a 12-hour on-site response realistic in the Yangtze Delta.
|
Site |
Role, area and coverage |
|
Shanghai (HQ) |
Songjiang · G60 Sci-Tech Corridor |
|
Nantong, Jiangsu |
Jiangsu Guangke |
|
Lianyungang, Jiangsu |
Lianyungang Guangke |
|
Wuhan, Hubei |
Wuhan Guangke |
04 — Quality
Acceptance is written down before the design starts.
The most common reason a capital project runs late is a disagreement about what “working” means. We remove that by fixing the acceptance protocol at design freeze and testing against it in front of the customer.
01 — Quality system
ISO 9001
Document control, incoming inspection and traceability across all four sites.
02 — FAT
Your parts, your takt
Cycle time, OEE and capability run at our plant with your components, witnessed and recorded.
03 — SAT
On-site acceptance
Repeat of the agreed protocol after installation, with a punch list and a dated close-out.
04 — Handover
Documentation package
EN schematics, I/O list, spare-parts list, O&M manual and source code escrow on request.
05 — Service
Six sales regions, four-hour answers.
Service commitments for domestic customers, and the standard we apply to export projects through a named project engineer plus remote diagnostics.
|
Commitment |
Standard |
|
Sales regions |
Six, following the automotive cluster map |
|
Enquiry response |
Within 4 working hours |
|
Technical issue handling |
Within 24 hours |
|
On-site, Yangtze Delta |
Within 12 hours |
|
Export projects |
Named project engineer + remote diagnostics |
|
Spare parts |
Recommended list supplied at handover |
Ask us the awkward questions first.
Cycle-time proof, fixture ownership, source code, spare parts, response time abroad — the subjects that decide whether a project succeeds are better settled before the PO.