Programmes, not brochures
Three projects that show how the engineering decisions were made — including the one where the layout constraint, not the cycle time, shaped the line.

01 — Case study
Tier-1 HVAC supplier · Europe
Two HVAC variants, one line, 62-second takt.
A Tier-1 supplier needed to localise front and rear HVAC unit assembly for a new platform, with a takt requirement that made manual leak testing impossible.
Result. The line reached agreed cycle time during FAT and passed SAT without a punch-list item on the test stations.
02 — Case study
Thermal module programme · East Asia
A twelve-station valve-module line at a 95-second cycle.
An integrated thermal module programme required valve-module assembly with leak verification before fill, and full data traceability demanded by the vehicle OEM.
Result. Two stations were re-balanced during FAT after the test station proved to be the constraint — before SOP, not after.


03 — Case study
Energy storage integrator · China
Nine qualification tests, in-line, on a ring layout.
A BESS integrator needed cooling units tested to a witnessed specification, in a building that could not accommodate a straight line.
Result. The ring layout fitted the available bay and kept the qualification sequence intact — no test was moved offline.
Your programme could be the fourth.
If you want to speak to a reference customer in your segment, ask — introductions are arranged case by case, with their consent.